Highways News


Please be aware that we have received notification of the following temporary road closures:  

---o0o---

PROPOSED TEMPORARY CLOSURE OF B3162, WINSHAM from 22 January 2024 until 27 February 2024

From the junction with Court Street to a point approximately 290 metres south  

Please follow this link for more information

--o0o-- 

Temporary Road Closure: ttro254523S - Ebben Lane, Winsham

Please follow the link to view the above road closure; https://one.network/?tm=135535166 and the link for the Notice 2: https://api-gb.one.network/downloads/tm/1111/03-notice-2_135535166_3646131_80cf611cab.pdf
The order becomes effective on 30th November 2023 and will remain in force for eighteen months.

The works are expected to commence on 4th December 2023 and last for 8 days to enable Gardiner Construction Ltd to install new water supply.

The contractor has indicated that access for Emergency Services through the site is permitted on this occasion.

For any further information about this closure please contact Chevron Traffic Management on 0771 733 0688, quoting reference: ttro254523S.

Please note that should you require to view a closure which is more than two weeks ahead, you will need to register for free with www.One.Network

 ---o0o---

 Temporary Road Closure: ttro741694S - Western Way, Winsham

 Please follow the link to view the above road closure; https://one.network/?tm=134052028 and the link for the Notice 2: https://api-gb.one.network/downloads/tm/1111/03-notice-2_134052028_3623698_5adb35afb2.pdf

The order becomes effective on 05th October 2023 and will remain in force for eighteen months.

The works are expected to commence on 9th October 2023 and last for 5 days to enable Milestone Infrastructure to carry out local drainage works.

The contractor has indicated that access for Emergency Services through the site is not permitted on this occasion.

For any further information about this closure please contact Somerset Highways on 0300 123 2224, quoting reference: ttro741694S.

Please note that should you require to view a closure which is more than two weeks ahead, you will need to register for free with www.One.Network

---o0o--- 

Temporary Road Closure: ttro717777S - Court Street, Winsham

Please follow the link to view the above road closure; https://one.network/?tm=134692141 and the link for the Notice 2: https://api-gb.one.network/downloads/tm/1111/03-notice-2_134692141_3602306_a840282a5a.pdf
The order becomes effective on 21st September 2023 and will remain in force for eighteen months.

The works are expected to commence on 25th September 2023 and last for 19 days to enable National Grid to carry out works to install new electric and water supply.

The contractor has indicated that access for Emergency Services through the site is not permitted on this occasion.

For any further information about this closure please contact National Grid on 01823 348 575, quoting reference: ttro717777S.

Please note that should you require to view a closure which is more than two weeks ahead, you will need to register for free with www.One.Network 

---o0o--- 

Temporary Road Closure: ttro720988S - Down Lane, Winsham

Please follow the link to view the above road closure; https://one.network/?tm=134362229 and the link for the Notice 2:https://api-gb.one.network/downloads/tm/1111/03-notice-2_134362229_3594517_b5aaee3a11.pdf
The order becomes effective on 31st August 2023 and will remain in force for eighteen months.

The works are expected to commence on 4th September 2023 and last for 26 days to enable National Grid to carry out works to install new cable.

On September 26th the period the road would be closed for was extended until October 13th.

The contractor has indicated that access for Emergency Services through the site is not permitted on this occasion.

For any further information about this closure please contact National Grid on 01823 348 575, quoting reference: ttro720988S.

Please note that should you require to view a closure which is more than two weeks ahead, you will need to register for free with www.One.Network

---o0o---

Urgent / emergency Road Closure: – ttro991574S- WW - Horn Moor, Tatworth and Fornton

Please be aware that we have received a notification of a TTRN (urgent / emergency) road closure at Horn Moor, Tatworth and Forton  which will commence on
 17th August 2023 - 21st August 2023 (00:0023:59) for a total of 5 days.

This will enable Wessex Water to carry out Main leak repair works.

The contractor has indicated that access for Emergency Services through the site is not permitted on this occasion.

For any further information about this closure please contact Wessex Water on 03456 004 600, quoting reference: ttro991574S.

Please visit one.network https://one.network/?tm=135279222 where you will see the map of the affected area (in red), together with the supplied diversion route (in blue).

Please note: this diversion route could be subject to change on review

---o0o---

Emergency Road Closure: – ttro052963S - OR - Horn Moor, Tatworth and Forton

Please be aware that we have received a notification of a TTRN (emergency) road closure at Horn Moor, Tatworth and Forton which will commence on
 16th August 2023 - 16th August 2023 (08:0016:00) for a total of 1 day.

This will enable Openreach to carry out works to replace pole..

The contractor has indicated that access for Emergency Services through the site is permitted on this occasion.

For any further information about this closure please contact USL on 01884 763 100, quoting reference: ttro052963S.

Please visit one.network https://one.network/?tm=134929413 where you will see the map of the affected area (in red), together with the supplied diversion route (in blue).

Please note: this diversion route could be subject to change on review.

---o0o--- 

Temporary Road Closure: ttro440216SS - Chillington Down, Chillington

Please follow the link to view the above road closure; https://one.network/?tm=134139121 and the link for the Notice 2:https://api-gb.one.network/downloads/tm/1111/03-notice-2_134139121_3584140_0c305509c3.pdf
The order becomes effective on 10th August 2023 and will remain in force for eighteen months.

The works are expected to commence on 15th August 2023 and last for 6 hours (09:30-15:30) to enable Openreach to carry out overhead cabling work.

The contractor has indicated that access for Emergency Services through the site is permitted on this occasion.

For any further information about this closure please contact Sunbelt Rentals on 03700 500 792, quoting reference: ttro440216SS

Please note that should you require to view a closure which is more than two weeks ahead, you will need to register for free with www.One.Network

 ----o0o--- 

Temporary Road Closure: Whatley Cross To Street, Winsham  - Reference: SS05/0523/SD007612 - B3162 Whatley Cross to Street     

Please be aware that we have received notification of a temporary road closure at Whatley Cross To Street, Winsham for approximately 1007 metres, which will commence on 7th August 2023 and is expected to last until 20th August 2023 (between 07:30 to 18.00hrs). These works are for Somerset Highways to carry out surface dressing works., their works reference is LG210YFSD90725-01.

The works will be for ONE DAY within the stated period and the road will be reopened when no works are taking place

For any further information about this closure please contact Somerset Highways on 0300 123 2224 quoting reference: SS05/0523/SD007612 - B3162 Whatley Cross to Street.

A map of the affected area (in red), together with the recommended diversion route (in purple) is shown below, along with the link to One.Network.
https://one.network/?tm=134255243

  ----o0o---

 Temporary Road Closure: ttro259167SS-Court Street, Winsham

 Please follow the link to view the above road closure; https://one.network/?tm=133565254 and the link for the Notice 2:https://api-gb.one.network/downloads/tm/1111/03-notice-2_133565254_3569807_bd4a97afad.pdf

The order becomes effective on 29th June 2023 and will remain in force for eighteen months.

The works are expected to commence on 3rd July 2023 and last for 5 days to enable Jurassic Fibre to carry out core drill and overlay work..

The contractor has indicated that access for Emergency Services through the site is not permitted on this occasion.

For any further information about this closure please contact Jurassic Fibre on 07780 060 809 , quoting reference: ttro259167SS

 ----o0o---